内页banner
  • Accurl Press Brake Setup & Installation Guide
    Accurl Press Brake Setup & Installation Guide Mar 28, 2025
    The bending machine is the most expensive to install. Analytical sketch The operator must be fully familiar with its components. If the part has already been manufactured, it may not be necessary to modify the design, but ultimately the operator must understand that: Material type and density. Flange dimensions and tolerances. Necessary Angle and Angle tolerances. Angle inside the arc. Blank size. In the absence of any of these data, supervisors will need to make educated assumptions. The part is now at risk of being inaccurate. An important initial step is to obtain detailed drawings.   Tool selection The sketch is used to select the tool. There are several options for you to choose from: air bending, bottom bending, coinage or custom use. For example, if the layout requires a bottom tool and the internal arc length is equal to the metal density. For that particular type of machine, you should use a tool with at least the same precision as the tool manufacturer recommends. No matter how accurately the bending machine is installed, worn equipment will not produce the right product.   Calculated tonnage It should be easy for the operator to estimate the tonnage required. Regarding air bending, there seem to be tonnage charts available. A reasonable calculation for bottom bending is nearly three times the air bending tonnage. Stamping requires about eight times the bending tonnage of air. The supplier will provide tonnage estimates for custom application tools. Do not attempt to bend until you have determined the tonnage required and compared it to the tonnage provided.   Select a bending machine If you have only one press in your workshop, you can skip this step. If you have more than one press, make sure that the press you choose is best for the task at hand. The center of the press has a tonnage per inch limit. Multiply the length of the side panels by 0.6 to find the tonnage per inch of the press, then start dividing your estimate by the tonnage of the machine. For items 12 inches wide, the maximum tonnage of the machine center should not be higher than 25 tons. 25 tons over 12 inches will produce compression overload. This is a bad decision because it could permanently damage the ram. When using tonnage control (manual and CNC), be sure to use only the amount required for the torsion parts and do not exceed the tonnage threshold in the middle. Also, keep in mind that overload of the bender is only allowed when the bottom is compacted, cast, or air bent with dedicated tools. Select tool location If the required tonnage exceeds the concentrated weight limit at the center of the system, you may be able to complete the task off-center. However, you should first verify that the bender supplier allows eccentric loading to proceed. Eccentric work is acceptable as long as you follow the manufacturer's guidelines. If you have more ideas, please contact us! Tel: +86 -18855551088 Email: Info@Accurl.com Whatsapp/Mobile: +86 -18855551088

Need Help? Chat with us

leave a message
If you are interested in our products and want to know more details, please leave a message here, we will reply you as soon as we can.
Submit
Contact us #
+86-555-2780553

Our hours

Online 24 hours a day

Home

Products

whatsApp

contact